The Reimagine Bridge Street project goals are to improve pedestrian connectivity
and safety; and long-term traffic operations along the Bridge Street corridor.

New Paint

The final design incorporates a quiet zone at the existing UPRR at-grade-crossing on Bridge Street, which requires the installation of 4-quadrant gates & vehicle presence detection. A new utility bore under 3 UPRR tracks at the at-grade-crossing will facilitate coordination of 2 signalized intersections and the UPRR signal inter-tie. The final design removes the remaining overhead utilities to allow room for the traffic signal poles. The roadway will be rehabilitated from Riverside Drive to the north side of Donner Pass Road, and include new curb, gutter, sidewalk, paver crosswalks and ADA ramps. Acumen is responsible for the streetscape / roadway design; above ground utility relocation to underground; UPRR at-grade-crossing design, utility bore design; 4-quadrant gates design; UPRR, Town of Truckee, utility and property owner coordination; UPRR encroachment permits; ADA compliance of sidewalk, crosswalks, and ped ramps; maintaining required cover over the Kinder Morgan high pressure petroleum line; full set of design plans, cost estimate and specifications as well as bidding and construction services.